From: route@monster.com
Sent: Tuesday, March 22, 2016 12:29 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: Right of Way
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
Adam W. Gadbois
Architectural Project Manager / Construction
Manager / Licensed General Contractor Present Address: 2976 E 135th Way Thornton, CO
80241 (720) 260-9273 (303) 920-8977 SUMMARY OF WORK EXPERIENCE Over twenty years of providing creative innovative
Leadership, Owners Representation, Project Management, Construction
Management, Facilities Management, Architectural Design, Space Planning,
Wireless Communications, Business solutions, , Vendor Management, CAD
Design/Drafting, Permit expediting, Code Research, Strong client relations
skills. STRENGTHS
· Leadership by managing and motivating any team, including the
interface between clients, local business leaders and senior management. · Managing project completion to expected results, due to an attention
to detail and prioritizing with an understanding of the whole picture. · Strong communication skills, utilizing technology for fast turn
around with results. · Ability to value engineer. Excellent with problem solving,
incorporating alternative solutions that add cost savings. KEY PROFESSIONAL COMPETENCIES · Detailed Construction Management and scheduling skills · Strong technical experience with Architectural Design & Space
Planning Criteria · Award winning track record for successful projects · Experienced with preparing RFP documents, procurement and bid
selection · Develop and manage multi million dollar budgets · Coordinate, execute and direct project planning · Incorporating “Value Engineering” resulting in cost savings · Excellent at managing and motivating team members, including
contractors, to meet schedule and budget objectives · Experienced in directly interfacing with Executive level personnel · Well developed organizational and leadership skills · Solid understanding of project scheduling and keeping strong client
relations · Persuasive contract negotiation skills with the ability to procure
the best services with a minimal investment. · Excellent knowledge of the ADA (American Disability Act), ensuring
that all facilities meet the requirements. · Understanding of business concepts and managing to the bottom line
schedule and budget · Skilled in proposal preparation and delivery (presentations) · Engaged with the USGBC (United States Green Building Council) for
LEED (Leadership in Environmental and Energy efficient Design) certified buildings AWARDS
· 2008 Building GOLD Lead certified for GREEN construction, City of St
Lewis, Missouri · 2008 Innovative Building of the Year, City of Milwaukee, Wisconsin · 2005 Design Innovation award for best technology on 3-Dimensional flight videos Department of Energy · 1999 Proactive Telecommunications Engineering Success Award, Adaptive
Broadband · 1994 Outstanding Community Commitment Award, Fort Collins Rocky
Mountain Raptor Society VOLUNTEER
· Head of the Design Review Committee for home owners association of
over 800 homes · Colorado Division of Wildlife, Take a family fishing · Development of Green Building awareness presentations PROFESSIONAL EXPERIENCE ENGlobal Mapping & Civil Design Sr. DesignerJan. 2015– Present Responsible for Complete creation and design of
Pipeline Construction Documents, Alignment Sheets crossing drawings and all
related permitting documentation. Using AutoCAD MAP, Civil 3D, Bluesky, and
Skyline . Design Horizontal Directional Drill (HDD) plans for Pipeline
construction documents. CH2M Hill Operations and Management Division Facilities Operation Manager, City of CentennialJan. 2014 – Jan. 2015 Responsible for the Facilities Operation for the
City of Centennial and all the city Facilities and fleet maintenance. Oversee
all Capital improvement projects for new construction and facility growth.
The Facility Operations Manager is responsible for the 30,000 sf Municipal
building, the 20 acre City Center park and splash pad water park. The City also
has a 9.5 acre Public works facility including 14,500 SF of Office, 12,500 SF
of maintenance shop and 7,000 Sf storage facility. Responsible for 2 Full
time technicians, and 5 seasonal park maintenance employees. CH2M Hill Operations and Management Division Construction Project Manager / Owners RepresentativeMay 2013 –
Jan 2014 As the Owners Representative, review and
develop a program plan with executive City Managers Staff to determine
facility requirements, head count and space allocation for City of Centennial
Public Works Facility’s 13,000 S.F. Maintenance Building and 15,000 S.F.
Administrative office Building. Working very closely with and manage the
General Contractor to coordinate permitting, zoning, fire marshal’s office
approvals, while coordinating the electrical, mechanical, fire safety and
security sub-contractors. Duties include the design, RFP, procurement and
Project Management of the security system including intrusion, access
control, and CCTV monitoring. Responsibilities also include the design, RFP,
procurement and Project Management of the building and site signage. CH2M Hill / Trigon EPC Energy & Chemical Division Sr. Mapping Designer / GIS Specialist Feb 2011 –
May 2013 Responsible for Complete creation and design of
Pipeline Construction Documents, Alignment Sheets crossing drawings and all
related permitting documentation. Using AutoCAD MAP, Civil 3D, Bluesky, and
Skyline as a Leading designer on multiple Pipeline projects while determining
pipeline routing, and constructability with Project Management and
Engineering Team. Managed GIS data using Microsoft Access database, Arc GIS
and New Century GIS alignment sheet generator. Working closely with the
Bureau of Land Management and Environmental agencies to provide detailed maps
and reports showing environmental impact and planned solutions for
construction. Coordinated with field construction team to track and direct
survey crews as construction progress continued. Enserca Engineering - Design ManagerFeb 2009 –
Feb 2011 Responsible for Civil, Structural, and Architectural
design department. Manage three Full time Designers and the complete creation
and design of Pipeline Construction Documents, Alignment Sheets crossing
drawings and all related permitting documentation. Position requires close
coordination between disciplines to ensure a cohesive final construction drawing set. Corporate Express (Now Staples) -
Design/Construction Project Manager – Nov 2005 – Dec 2008 As the Owners Representative, review and
develop a program plan with executive market President and Vice President to
determine facility requirements, head count and space allocation for 300,000
plus Square Foot, twenty million dollar super warehouses. Responsible for
Complete design of Architectural background Documents while ensuring building
code & ADA compliance, to be provided to the developer for
construction. Responsible for all finish selections to maintain a
corporate image while providing a working showroom environment. Complete
design and management of the pick to voice wireless system built within each
Distribution Center. Close coordination with the furniture division is
required on all projects to ensure the furniture has appropriate voice / data
and power to energize the furniture systems. Work very closely with and manage the developers
General Contractor to coordinate permitting, zoning, fire marshals office
approvals, while coordinating the electrical, mechanical, fire safety and
security sub contractors. Duties include the design, RFP, procurement and
Project Management of the security system including intrusion, access
control, and CCTV monitoring. Responsibilities also include the design, RFP,
procurement and Project Management of the building and site signage. Upon Facility construction completion, my group
assists in the move from the existing facility into the new space, working
closely with IT and the telecom group. The last phase is to decommission the
old building and return it to a lease able condition for the property
management company. All ten new buildings that I have completed with
Corporate Express have finished on schedule and budget. Source One Architecture-Lead Architectural Project
Manager April
2005 to Nov 2005 Provided full architectural
design, and space planning for Quiznos
restaurants including creation of full construction documents and bid
selection. Managing the
design lifecycle and producing the construction documents, for major
franchised organizations. Responsible for the selection of contractors and
managing 15 new restaurant projects from permitting to final
construction. Trigon-EPC -Senior Designer June 2004 to April 2005 Lead designer of a complete creation and design of
Pipeline Construction Documents, Alignment Sheets crossing drawings and all
related permitting documentation. Creating all certified plat drawings and
legal descriptions for final property purchasing. Assisting in assigning
workloads and supporting junior staff with technical and survey questions. Parsons Brinckerhoff -Telecom -Sr. Design and Construction
Project Manager –June 2001 to May 2004
Managed the design and construction of large scale
structural and Wireless telecommunications projects. Preformed site visits
across the USA meeting with contractors for bid walks and pre construction
kick off site meetings. As the Construction Project Manager, my
responsibilities included scheduling, and coordinating the sub-contractors to
ensure all aspects of construction were completed on time and on budget. Carter & Burgess, Inc. Telecom -Project Manager June 2000 to
June 2001 Responsible for project and staff management of OSP
(Out Side Plant) network engineers, AutoCAD and Microstation designers, and
support personnel developed and provided automated IT engineering solutions
streamlining processes and field data collection methods. Designed the front
end of the site web for publishing engineering drawings on the web. Worked
with clients to provide schedule sensitive network engineering and as-build
services for long haul backbone systems, city loops, and last mile
telecommunication projects, construction oversight, Right-of-Way negotiations
and operations. Improved product quality and reduced process time by over 70%
by automating the engineering process. Worked with clients to establish
company standards and procedures and the application of GIS (Geographic
Information Systems) facilities management systems to increase client product
quality while providing client cost savings. US West Wireless - Construction Coordinator / GIS
Analyst Jan 1996 to June 2000 As a construction coordinator, managed the
construction process from pre bid meetings, the selection of the contractor,
to the final inspection for new PCS Cell site, and expansion projects.
These processes of cell site construction include, coordinating, scheduling,
and overseeing the final quality of the product provided by contractors. Developed and managed standards for the design of
environmentally aesthetic cell phone sites. Produced graphic photo
simulations, using AutoCAD Map and 3-D, tied this data into an ESRI Arc view
GIS. Designed and produced GIS and Graphic exhibits for the executives to
present to the board of directors and zoning hearings. Made available Web
pages for the purpose of posting GIS Maps, Photo Simulations, and other
Engineering Services related Graphics. Designed mounting and construction
hardware, as well as managed the production. Automated project solutions
for business clients. Provided set-up, support, automation tools, standards,
training, and management to project subs. Assisted in the development of the
design and maintenance of the Engineering Services Division’s web site. Electric Field Survey Manager - Mid States
EngineeringDec
1993 to Jan 1996 Staffed, trained and managed over 20 personnel.
Wrote project standards, interfaced with client, responsible for the on-site
project production and Systems support departments. Implemented a regional
project tracking database system. Managed and supported over 30
Pen-Based field laptop computers with Trimble GPS Units using Microstation to
collect and draft electric distribution facilities into a full GIS Mapping
system. Instilled a winning team atmosphere, automated workflow processes,
and drastically reduced project production costs. Developed a design
production team that consistently outperformed all other production centers
and subs on the project by better than a 4-to-1 ratio measured by cost and
volume, and was awarded the highest profitable division in the organization
for 2 years. Owner / Manager-Legacy Sign Productions 1986 to 1993 Owned and managed a full service sign and graphic
design company. ADDITIONAL SOFTWARE TRAINING AND CERTIFICATION · Licensed Class B General Contractor · AutoCAD Release 2009, Map · Bentley Micro station versions 3.x, 4.x, 5.x, 95, SE, J · Arc View Training, Redlands California · MapInfo for Wireless Telecommunications · Letter Art 9.0 · Gerber Sign Software · Casmate Pro Sign Software · HTML Web Language |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
|